Chapter 826 Inspection
Liu Tao showed a helpless look.
This is not something that can be helped.
Who would have thought that such a variable would suddenly appear.
Liu Tao knew the wind in the capital in Yun Province. After all, he was at the core of the vortex, how could he not know.
Even some people who usually did not show their talents in Panshan Group jumped out.
That really surprised Liu Tao.
Among them were people he personally promoted and trained.
At this time, Liu Tao realized that the people he thought were his own were actually other people's people.
Liu Tao did not deal with them because the timing was not right and he had to wait until later, after the matter was over.
Even if Liu Tao really left Panshan Group, these people would naturally be dealt with by someone.
Moreover, this incident was also brought up for a general account, that is, in recent years, there were many employees in Panshan Group who had two children, three children, or even four children.
In this regard, a large sum of money was paid to the relevant departments every year.
Now, naturally, Liu Tao was blamed for this matter, and he was criticized for indulging employees and not fulfilling his leadership responsibilities.
What could Liu Tao say? Anything he said at this time would be wrong.
The three of them drank two more glasses of wine, and they knew each other well, so they could say anything and dared to say anything.
The huge pressure Liu Tao had been under during this period was also released at this time.
Before, he had been silently carrying all the pressure alone.
No matter who accused him, he did not respond.
He even knew that some people reported him anonymously and some reported him in real name.
All he could do was to remain silent and bear all the accusations.
He chose the road, and he had to go on it.
This time when he returned to Beijing for vacation, Liu Tao did not visit the leader, but left time for his wife and children.
He was really embarrassed to visit the leader.
The seven-day National Day holiday passed quickly.
After returning to the headquarters of Panshan Group and handling some affairs, Liu Tao took his secretary and drove the "Ray Eagle" helicopter to the Three Gorges Dam.
Looking down from the air, there is a huge construction site below.
The first phase of the cofferdam has been completed and the ship lock is under construction.
The Three Gorges Ship Lock is a double-line five-level ship lock, which is unparalleled in the world. It is 6.4 kilometers long, of which the main part of the ship lock is 1.6 kilometers and the navigation channel is 4.8 kilometers. The normal water storage level in front of the Three Gorges Dam is 175 meters above sea level, and the lowest navigation water level under the dam is 62 meters above sea level. In other words, the ship lock has a drop of 113 meters up and down, and ships have to climb over the height of a 40-story building to pass through the ship lock.
It can be said that this is the largest ship lock in the world!
The Three Gorges Ship Lock is the ship lock with the most ship locks in the world. Its construction difficulty, ship lock length and head difference are all the first in the world. Among them, the maximum working head of a single stage is 45.2 meters, which is the "highest head" among the world's ship locks. The Three Gorges ship lock is located in the hills on the left bank of the dam area. A channel was opened up to build the ship lock. In order to build the ship lock, a total of 18 hills had to be flattened, and the maximum height of the slope excavation reached 170 meters, which is unprecedented in the world's ship lock construction.
With a large amount of funds, a large number of construction teams and construction equipment were mobilized, and the construction progress was very fast.
The time point of the entire Three Gorges Project is very clear. Everyone's goal is to advance the time point as much as possible, rather than delay it.
After staying at the Three Gorges Dam for three days, Liu Tao went to inspect the four major hydropower stations on the Jinsha River.
Everyone's eyes are focused on the Three Gorges Hydropower Station, but they don't know that the four major hydropower stations on the Jinsha River are also century projects. In terms of installed capacity and power generation, the four major hydropower stations on the Jinsha River are still above the Three Gorges Hydropower Station.
Moreover, the difficulty of construction is also rare in the history of Chinese water conservancy.
After a large number of reservoirs and hydropower stations have been built in Yunnan Province in the past ten years, a group of water conservancy talents and a group of skilled construction teams have been trained.
In the past ten years, we have overcome a lot of difficulties, conquered many obstacles, and accumulated a lot of construction equipment.
Without the accumulation of the past ten years, it would be impossible to start the century-old projects such as the four major hydropower stations on the Jinsha River and the Three Gorges Hydropower Station.
Not only the construction team of the project, but also the construction personnel of the Southwest Power Grid are also setting up high-voltage towers and high-voltage wires on the vast land.
When the hydropower station generates electricity, the electricity must be transmitted through the high-voltage power grid.
Therefore, the power grid project was started simultaneously.
Although the Southwest Power Grid sells a lot of electricity every year, it is not profitable at present, and even loses money, because it is frantically building and establishing the power grid.
One by one, the construction teams are working in the wilderness.
Behind the construction of the high-voltage power grid and the construction of the substation, there is a group of people who silently contribute.
In order to speed up the construction of the power grid, Panshan Group even transferred a batch of "Ray Sculpture" helicopters to the Southwest Power Grid.
Now, due to the emergence of the Southwest Power Grid, the Chinese power grid has been reformed, forming the Southwest Power Grid, Northeast Power Grid, Northwest Power Grid, North China Power Grid, East China Power Grid, Central China Power Grid, and Southern Power Grid.
These power grids each cover specific provinces and regions, forming a relatively independent power supply network.
For example, the Southwest Power Grid covers Sichuan, Shancheng, Yunnan Province, Guizhou Province, Guangxi Province, and the snowy area.
Then through cooperation, it sells electricity to the Central China Power Grid, East China Power Grid, and Southern Power Grid.
The Southwest Power Grid is the biggest creditor of the Central China Power Grid, the East China Power Grid, and the Southern Power Grid. It not only owes the three major power grids unpaid debts for electricity purchases, but also the debts of borrowing money from the Southwest Power Grid for power grid construction.
The seven power grids are independent, not subordinate to each other, and have parallel relationships, but they are closely related and have close exchanges.
The power generation of the seven power grids also shows obvious differences. The Northeast Power Grid, the Northwest Power Grid, and the North China Power Grid are mainly thermal power, supplemented by hydropower. The Central China Power Grid and the East China Power Grid are both thermal power and hydropower. The Southern Power Grid is mainly hydropower and thermal power, supplemented by nuclear power. The Southwest Power Grid is mainly hydropower and supplemented by thermal power.
The Southwest Power Grid is the strongest in terms of strength. Whether it is financial resources, team building or fixed assets, the Southwest Power Grid is far superior to the other six power grids.
As for wind power and solar power generation, they can be ignored in China at present.
Liu Tao attaches great importance to these large hub projects, and has attached great importance to them since the planning stage, because they are truly large-scale livelihood water conservancy projects that can generate huge economic and social benefits, but once they are not done well, they will be harmful, and the harm caused is also extremely great.
Not to mention the current construction phase, even in the operation phase, he would go to check every one or two years, and then find problems in advance to avoid major disasters.
Because of the navigation plan of the Jinsha River, the four major hydropower stations on the Jinsha River are equipped with ship lifts. When the project is completed in the future, coupled with the subsequent step-by-step development and construction, the entire Jinsha River will be navigable. Large ships cannot be navigable, but there is no problem for 500-ton ships to navigate.
Now Panshan Group has invested heavily in building reservoir hydropower stations on the Yangtze River system, Lancang River, Nujiang River, Yarlung Zangbo River, and Pearl River, and the country is planning the development and utilization of the Yellow River.